Production engineer. Software builder.

The data Alberta’s oil and gas industry needs is already public. I build the tools that make it usable.

I’m Kevin Kwan. I spent eight years as a production engineer at companies including Devon Energy and Canadian Natural Resources. I now build software for the industry I came from, starting with Well Watch.

Lead project

Well Watch: the regulatory work your wells need this year, already listed.

Every year, each district has to work out which inactive wells need an inspection or a suspension, how to reach them, and what it will cost. I used to do that myself. Well Watch builds the list from the AER’s public records, so the engineer checks it instead of compiling it.

List
What falls due, by December 31Every inactive well with its risk class and the Directive 013 work that falls due this year.
Access
Winter and remote sites flaggedLikely site access for each well, so work can be bundled before the winter window closes.
Cost
Liability and spend behind itA Directive 011 estimate for every well, change alerts, and a closure spend forecast by year.

Proven at full provincial scale, on all eighteen sources.

Open the Well Watch page
Alberta wells by liability state 667,608 wells
Active173,804
Abandoned172,460
Reclamation certified129,351
Inactive67,340
Reclamation exempt37,358
Suspended22,816
Drilled18,868
Liability still openLiability closed

Top seven states shown.

Also built

The same approach, on two other public datasets.

alberta-road-bans

Twenty years of road bans, turned into a forecast.

460 provincial orders from 2004 to 2025, parsed out of PDFs. It shows when a spring ban usually goes on and comes off, and what it adds to a haul.

Hwy 22, Mayerthorpe to Jct 18: spring ban, 2015 to 2025
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Median start Mar 24. Eased by Jun 6.

Proof. In backtests, the actual start date fell inside the forecast range 84% of the time, against the 80% the range claims.

Historical analysis, not a list of current restrictions.

ngtl-api

NGTL pipeline data, without the dashboard.

Linepack every 30 minutes, flows, planned outages and end-of-day history from TC Energy’s public feeds, delivered by API, webhook, Excel and Power BI.

System linepack: 48 hours of sample readings
Latest 583.7 against a target of 585.0 (10⁶ m³).

Coverage. End-of-day history back to September 2021.

About

I’ve used the tools I’m now replacing.

For eight years I was a production engineer on conventional oil and gas assets, in the field and in the office, at companies including Devon Energy and Canadian Natural Resources. I worked with every part of the upstream business.

Early in my career I was responsible for the regulatory inspections and testing across my district: wells in the low hundreds, on a list that changed every year. Each year I rebuilt that list myself from the AER’s directives: which wells were due, what state each was in, which sites could only be reached in winter, and what work each one needed. Then I bid the work out to contractors and coordinated with field operators to get it done at the lowest cost.

Planning alone took two to three months, and longer the year a contractor fell through during bidding. Add the Directive 013 medium-risk suspensions, which need rigs and real capital, and it became a full-time job that earned no revenue. A list like that should have been handed to us. Instead it rested on a few junior engineers in a field office, with nothing to check their work against. Well Watch is the tool I wanted then.

Low hundreds of wellson one district’s regulatory list, every year
2 to 3 monthsto plan a single year of that work

Today I’m a software developer at SPLICE Software.

Contact

Send me your BA code and I’ll send back this year’s Directive 013 list for your licences.

Backing or building in this space? Email me directly.